Выберите город:
Tashkent, 16A Alisher Navoi str., Office: 501
+998 (93) 103-70-77
+998 (93) 103-70-77
+998 (93) 103-70-77
+998 (93) 103-70-77
Write to TELEGRAM
write to whatsapp
To call
Main News Installing charging for an electric vehicle

Installing charging for an electric vehicle

19 July 2024

Latest news

28.10.2024
Automatic turnkey parking in Uzbekistan
Read more
16.10.2024
Fire safety services: what is included and why is it important
Read more
READ ALL THE NEWS

The installation of charging for an electric vehicle includes several stages, starting with the selection of a suitable charger and ending with its connection and configuration. Here is a step-by-step instruction:

1. Identify your needs

• Charging Type: Determine which type of charger you need: Level 1 (120 V) or Level 2 (240 V). Level 1 charging is slow and can be plugged into a regular outlet. Level 2 charging is faster, but requires special equipment and connectivity.
• Installation location: Decide where the charger will be installed (for example, garage, parking in front of the house or workplace).

2. Prepare the necessary materials and equipment

• Battery charger: Select and purchase a charger that meets your needs and is compatible with your electric vehicle.
• Wiring: You may need additional cables, connectors, and fuses to connect the charger.
• Tools: Power tools such as drills, screwdrivers, measuring instruments, etc.

3. Get the necessary permissions and approvals

• Coordination with the power supply company: Check the requirements of your power supply company for the installation of chargers.
• Permissions: You may need to get permission to install the charger, especially if it is a level 2 charger.

4. Install the charger

• Location selection: Make sure that the installation location is protected from weather conditions and is easily accessible for connecting the car.
• Installation of the device: Follow the manufacturer’s instructions to install the charger. This usually involves attaching the device to a wall or other stable base.
• Power connection: Connect the charger to the mains. To charge level 2, it may be necessary to run a separate line from the switchboard with the installation of a separate circuit breaker.

5. Setup and testing

• Checking connections: Make sure that all connections are made correctly and securely.
• Testing: Connect the electric vehicle to the charger and check its operation. Make sure that the charging is going correctly and without failures.

6. Maintenance and operation

• Regular check: Periodically check the charger for damage or malfunction.
• Software Update: If your charger supports software updates, stay tuned for updates from the manufacturer.

Note

• It is recommended to contact a qualified electrician to install a Level 2 charger, especially if you have no experience in electrical work.

If you have specific questions or problems related to the installation of the charger, do not hesitate to clarify!

 

| Order the installation of a charging station

 

For more information, leave a request:
LEAVE A REQUEST